RV BUILDER NET .COM

 

HOMEFAAEAABUILDERS LOGRV BUILDERS LISTVENDORSVANS AIRCRAFT

Page 06.00 Kit 01 Arrives
06.00 06.01 06.02 06.03 06.04 06.05 06.06            

Builder Log  Kit - 01

Builder - Joseph D. Rhodes     RV-10 KIT  # 40744    Arrived 07/05/07
I arrived to pick up the Empennage kit at FedEx freight in Tampa on 07/05/07.

The cover was broke off and no bottom rails.

I reinstalled cover
Picked up Empennage kit at FedEx freight in Tampa  07-05-07
Kit one at the shop
Kit one
The Shop
The Shop
The Shop
Empennage kit out of the trailer and in the shop
Empennage kit no apparent damage
Temporary Hold On RV-10                                Adding Air conditioning and Insulation to Shop 
Ceiling  Insulation  and AC added  in Shop
 

Start to build vertical Stabilizer  09/23/07

 

 

   

Note: This is my builders log and is not Intended to replace Vans Construction drawings

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.