Step 1: Lay the F 1047A, -1047B-L, and - 1047B-R J - Stiffeners back in place in the notches of the frames and bulkheads as shown in Figure 1.  
Step 2: Cleco the F 1075 Aft Top Skin in place.
Using the rivets called out on Page 10-26, Figure 1, rivet the aft top skin to the three F 1047 J Stiffeners and to the F 1008 & 1009 Frames. When riveting to the frames, rivet from the center of the skins out to the sides. Do Not rivet the skin to the F 1007 Frame. It will be riveted to the frame, along with the F 1074 Forward Top Skin, when the tailcone is attached to the forward Fuselage. Rivet the sides of the aft top skin to the F-1073 Side Skins and the underlying F-1032 Longerons using the rivets  called out on Page 10-25, Figure 1. Do not rivet the front corner holes in the aft top skin which are common to the F-1007 Frame.
 
Step 3: Attach the F-635 Elevator Bellcrank to the F-1037A Bellcrank Angles using the hardware called out in Figure 2.  
Step 4: Bolt the two F-1037A Bellcrank Angles to the F-1035 Battery / Bellcrank Mount  using the hardware shown in Figure 3.  
Step 5: Attach the F-1035 Battery / Bellcrank Mount to the F-1037B & C Bellcrank Rib Angles using the hardware shown in Figure 3. Do not secure the fasteners in this step completely, the battery / Bellcrank mount will have to be removed later.  
VERTICAL STAB RUDDER HORIZONTAL STAB  ELEVATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG

Note: This is my builders log and is not Intended to replace Vans Construction drawings

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.