RV BUILDER NET .COM

 

HOMEFAAEAABUILDERS LOGRV BUILDERS LISTVENDORSVANS AIRCRAFT

 09.03 Elevators
09.01 09.02 09.03 09.04 09.05 09.06 09.07 09.08 09.09 09.10 09.11 09.12
09.13 09.14 09.15 09.16 09.17 09.18 09.19 09.20        
Step : 1 Remove the vinyl from the skins in the area of the tab. Mark the bend line on the skins as shown in Figure 2.

05/04/08

 

Step : 2 Clamp a skin between the surface of a work bench and a piece of wood with the bend line at the edge of the workbench as shown in Figure 3.

05/04/08

Step : 3 Begin forming the bend by hand using a small, wood block, then finish the bend by tapping back and fourth along the tab with a flush rivet set in a rivet gun that has been turned down low. finish the bend to 90° with a hand seamer.

05/04/08

VERTICAL STAB RUDDER HORIZONTAL STAB  ELEVATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG

Note: This is my builders log and is not Intended to replace Vans Construction drawings

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.