 08.11 Horizontal Stabilizer
08.01 08.02 08.03 08.04 08.05 08.06 08.07 08.08 08.09 08.10 08.11 08.12
08.13 08.14                    
Step 1: Press the two SB625-8 Snap Bushings into the 5/8" holes in the front spar assembly as shown in Figure 1.  
Step 2: Cleco the inspar rib, stringer and stringer web assembly (riveted on the page 08.10) into position on the front assembly. Do not rivet the assembly in place at this time since it shares rivets with two nose ribs.  
Step 3: Except for the two outboard HS-904 Inspar Ribs (see Figure 1), cleco the remaining inspar ribs to the front spar assembly. Slide the HS-1004 Inspar Ribs along the stringers to get them into position.

Rivet these ribs in place using the rivets called out in Figure 1. The rivets called out in the blow-up apply to the HS-1004 Inspar Ribs except for the inboard two

 
VERTICAL STAB RUDDER HORIZONTAL STAB  ELEVATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG

Note: This is my builders log and is not Intended to replace Vans Construction drawings

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.