 08.03  Horizontal Stabilizer
08.01 08.02 08.03 08.04 08.05 08.06 08.07 08.08 08.09 08.10 08.11 08.12
Step 1: Cleco the VA-146 Flange Bearing between the two Hs-911 Inboard Hinge Brackets as shown in Figure 1. Final-Drill the six holes common to all the parts with a #30 drill and the two 3/16" holes in the flange of the hinge brackets with a #12 drill.

Disassemble, deburr, scuff the powder coating of the hinge brackets if desired, and reassemble.

Rivet the assembly together with the rivets shown in Figure 1. Clamp the flanges of the two hinge brackets to something flat to make sure that they remain square to each other while riveting.

 
Step 2: Bolt the inboard hinge bracket assembly to the rear spar assembly using the hardware shown in Figure 2. Use the correct torque on the nuts per the chart in section 5V.  
Step 3: Using the dimensions in Figure 3,  Make the HS-1008-L Left Front Spar Attachment Bracket from a length of AA6-187x2x2x1/2 angle provided in the kit. Be very accurate in drilling the 1/8" hole which will be used to locate the bracket on the front spar assembly.

01/13/08

Step 4:  Repeat step 3, but use the dimensions in Figure 4, to make the HS-1008-R Right Front Spar Attachment Bracket.

01/13/08

VERTICAL STAB RUDDER HORIZONTAL STAB  ELEVATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG

Note: This is my builders log and is not Intended to replace Vans Construction drawings

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.