Vans RV Builders List
Vans Models Joes RV 12
EAA FAA
Sun n Fun FAA Registry
Oshkosh NTSB
Empennage kit Wing Kit Fuselage Kit Finishing Power Plant Avionics Paint Interior
Page 07.02  Rudder
07.01 07.02 07.03 07.04 07.05 07.06 07.07 07.08 07.09 07.10 07.11 07.12

Step 1: Separate the R-1003 top rib parts, shown in Figure 1, into individual components: the R-1003A and R-1003B. The shaded areas shown in the figure should be completely removed. Deburr all the edges to prevent scratching during fitting. 

12/23/07

Step 2: Separate the R-1004 bottom ribs parts, shown in Figure 2, as described in step 1.

12/23/07

Step 3: Separate the R-1010 shear clip parts, shown unbent in Figure 3, as described in step 1.

12/23/07

VERTICAL STAB RUDDER HORIZONTAL STAB  ELEVATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG

Note: This is my builders log and is not Intended to replace Vans Construction drawings

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.